Krasnoyarsk Krai

In June 2012, construction of the new road bridge across the Yenisei River in Krasnoyarsk began. The feasibility study, blueprints, and work documentation were drawn up by Transmost, a public limited company.

The bridge has 2х33,0+(105,0+210,0+2х180,0+210,0+105,0) +(2х63,0)m span and its length is 1195.40m.

The combined bridge is designed for road transport and railway, the length of the bridge is 1611.26m. The total length of bridge approaches is 8353.4m. The total length of river crossing structure is 9961.56m.

This river crossing structure is 28km away from the downtown. The width of the river under the bridge is 589m. The total length of the bypass of Krasnoyarsk is 32.3km. The project includes construction of 11 bridges and viaducts, including this bridge across the Yenisei River. The bridge has 33.0+(126.0+231.0+126.0)+3x63.0+3x33.0m span. The total length of the bridge is 814.3m. It also has 2-lane carriageway, which width is 11.5m. River bed piers are constructed for full development, for 4-lane carriageway. The river bed part of the bridge is the half through truss with 126+231+126m span.

This bridge has 3x33.0+(63,0+115,5+63,0)m spans and its total length is 351.38m. The width of the bridge is 2x11.5 plus two footpaths 1m-wide each. Superstructures and piers are different for two traffic routes. Three 33m-long spans consist of prestressed reinforced concrete beams.