+7 (812) 332-62-33

Ukraine

The combined bridge is designed for road and railway transport. It has 11x56.1+57.4+3x111.6+57.3m spans, the total length of the bridge is 1066m. It has two track railway and 6-lane carriageway. Railway superstructure is situated in the center of the piers and on both sides there are carriageways. The cross-section of this bridge consists of three spans with same abutments.