The existing mountain road from Adler to Red Meadow was bumpy and dangerous, did not correspond to the up-to-date standards. Some parts on the road had contra flow traffic systems. Design and construction of this road refers to the large scope of road works for the Olympic Games 2014 in Sochi. All the construction areas are characterized by quite difficult building conditions. The seismic can reach the point of 92.

The bridge across the Kepsha has one 63m span and is located near the tunnel. The superstructure is steel and continuous - hinged tied arch with through truss. The bridge has peculiar antiseismic system.

Year of completion: 2005