The bridge is located in the historical part of the city. This meant the high architectural requirements for the bridge design.

The bridge has 27.0+39.0+27.0m spans, the width of the carriageway is 4.5m. The superstructure is steel and continuous with polygonal contour of the lower chord and perforated sides of girders and orthotropic pedestrian path.

The surface of the pedestrian path is covered by natural granite. All the piers are faced with granite slabs.

Under the design the architectural highlighting is placed.

Type of works done: detailed design

Year of completion: 2011