The combined bridge across the Irtysh river in Omsk is a part of the first metro line from Red Way station to the Bus station. The bridge is designed for two-track metro railway at the lower level and 6-lane traffic at the upper level.

The river bed part of the bridge has 108+3х144+108m span. The superstructure consists of two separated beams with 7.2x7.0m box cross section, orthotropic deck and ribbed metro railway slab. Each beam is designed for one-track railway at the lower level and 3-lane traffic at the upper level.

Type of works done: design

Year of completion: 2008