Transmost has been actively involved in the design of civil engineering structures on roads and railways for the Sochi Olympic facilities since May 2008. The primary difficulties encountered by the Transmost specialists when working on these facilities were the elevated seismicity (up to Degree 9) and the confined conditions in the construction area.