The environment of junction is constrained: steep slopes, landslides, high seismicity, and large amount of engineering communications.

The junction has the pipe type, dividing the traffic into two levels. The Transportnaya street is running at the lower level, the ramp of the road on the bypass of Sochi overlaps this road with the viaduct with 2x37.5m span. The superstructure of this viaduct is continuous composite beam, with pile foundation.

Under this project the construction of nine retaining walls and landslide protection structures, illumination system, engineering systems and site landscaping are prescribed. All works will be done without traffic stoppage

Type of works done: detailed design and construction supervision

Year of completion: construction is on hold